PRODUCTION TRACKING

Our gear is manufactured in batches. Each production run is locked on the 10th of every odd-numbered month (January, March, May, July, September, November): every order placed up to that date is included in it. Shipping begins at the end of the following month, barring any unforeseen issues.

Example: order placed on November 4 → production locked on November 10 → shipping from the end of December.

CURRENT CYCLE

Orders placed through 10/09/26

Shipping starts late October 2026

NEXT CYCLE

Order before 10/11/26

Shipping starts late December 2026

The Stages of Your Order

1

Production Lock

On the 10th of each odd-numbered month, all orders received are added to the production run, including after-sales service requests.

Email: “Your order is in the next run”

2

Manufacturing

Products are made in our workshop in Europe (about 30 days).

Email: “Your order is being manufactured”

3

Inspection and Preparation

Quality control, assembly, packing, then preparation of your package.

Email: “Your package is being prepared”

4

Shipping

From the end of the month following the production lock. You’ll be notified by email when your package ships.

Email: “Order shipped”

Frequently Asked Questions

Which cycle is my order in?

Order placed no later than lock day (the 10th): it is part of that production run. After the 10th: it joins the next production run, two months later.

How will I be notified?

You’ll receive an automatic email at each stage (see above). Be sure to check your spam folder.

Where can I see my order status?

In your customer account: My Account → Orders.

Have a question about your order?

Contact us using the form and include your order number.

My Cart
Recently Viewed
Categories